DISCOVERZANZIBARContact us
← Investment Projects

PUBLIC HOUSING · UNGUJA & PEMBA

Zanzibar Housing
Programme

A proposed 45,000-home programme, connecting housing, community facilities and urban infrastructure across Zanzibar.

Zanzibar Housing CorporationPre-feasibility · March 2024
Explore the proposed sites ↓
Kwahani proposed housing design from the March 2024 ZHC report
Proposed architectural visualisation from the 2024 study, not a photograph of completed construction.
Read this as a programme proposal, not a live tender. This page presents the supplied March 2024 ZHC pre-feasibility study. Current availability, procurement, approvals, funding and delivery progress have not been confirmed for the programme as a whole. Figures are historical estimates, not offers or guaranteed returns.
45,000headline housing target
TZS 4.65tn2024 estimated programme cost
11component profiles in the study
2 islandsUnguja and Pemba

THE PROGRAMME

Homes and the places
that support them.

The study proposes modern housing for low-, middle- and higher-income groups, including civil servants and the wider public. Residential development is combined with commercial space, estate roads, utilities and selected community facilities.

Zanzibar Housing Corporation is identified as the implementing authority. The programme is framed within Zanzibar Vision 2050 and the need for accessible, affordable housing.

What the proposal includes

  • Two-, three- and four-bedroom apartments and other housing types.
  • New development and redevelopment of occupied sites.
  • Shops, markets, parking and commercial premises.
  • Schools, a mosque, health and recreation facilities at selected sites.
  • Water, electricity, access roads, drainage and sewerage coordination.

The report draws on fieldwork from July–October 2022. Its market statistics and demand forecasts should not be treated as current data.

COMPONENTS OF THE 2024 STUDY

One programme.
Multiple local opportunities.

Scope, budgets and site conditions below are attributed to the source report. No component is represented here as currently open for investment.

Unguja · Urban District

Saateni

Indicative homes
336
2024 budget · TZS billion
61

14 residential blocks, G+6; two-, three- and four-bedroom apartments.

Land: 65,000 m²
Proposed structure: PPP with land as equity

Status described in March 2024: Existing ZHC residences and a JKU camp. Source p. 13.

Pemba · Chake Chake

Mfikiwa

Indicative homes
180
2024 budget · TZS billion
40

17 residential blocks, G+4; commercial building, school and mosque.

Land: 21,375 m²
Proposed structure: Grant/government contribution, PPP, JV or FDI

Status described in March 2024: The report records tendering and completed ESIA, topographic, soil and TCAA studies. Not a current tender notice. Source p. 14.

Unguja · Urban District

Kwahani

Indicative homes
720
2024 budget · TZS billion
150

30 residential blocks, G+4; shops, restaurant, health centre, recreation, roads and estate facilities.

Land: 195,000 m²
Proposed structure: PPP with land as equity

Status described in March 2024: Privately owned houses identified for redevelopment. Land rights, compensation and relocation need confirmation. Source p. 17.

Unguja · West B

Kisakasaka · redevelopment

Indicative homes
240
2024 budget · TZS billion
62

12 residential/commercial buildings, G+7; market, shops and parking.

Land: 22,368.161 m²
Proposed structure: PPP with land as equity

Status described in March 2024: 11 existing single-storey semi-detached houses described. Source p. 19.

Unguja · West B

Nyamanzi

Indicative homes
120
2024 budget · TZS billion
24

Four residential/commercial buildings, G+8; report states four units per floor, but its stated total needs reconciliation.

Land: 11,000 m²
Proposed structure: PPP with land as equity

Status described in March 2024: Six existing single-storey houses described. Source p. 21.

Pemba · Wete

Wete Police Line

Indicative homes
250
2024 budget · TZS billion
45

Five residential blocks, G+6; two-, three- and four-bedroom apartments.

Land: 120,000 m²
Proposed structure: PPP with land as equity

Status described in March 2024: Existing ZHC residential units. Source p. 23.

Unguja · Urban West

Chuini

Indicative homes
600
2024 budget · TZS billion
150

60 residential blocks, G+4; residential, commercial and supporting facilities.

Land: 370,000 m²
Proposed structure: EPC + finance

Status described in March 2024: Reported as undeveloped. Source p. 25.

Pemba · Wete

Finya

Indicative homes
2,260
2024 budget · TZS billion
200

100 residential blocks; shops, restaurant, health centre, recreation and estate infrastructure.

Land: 195,000 m²
Proposed structure: PPP / EPC + finance

Status described in March 2024: Privately owned housing identified for redevelopment. Source p. 26.

Unguja · West B

Kisakasaka · new city

Indicative homes
300
2024 budget · TZS billion
68

New residential development and associated facilities.

Land: 35,000 m²
Proposed structure: PPP / EPC + finance

Status described in March 2024: Reported as undeveloped. Separate component from the Kisakasaka redevelopment above. Source p. 27.

Unguja · Central District

Dunga

Indicative homes
37,000
2024 budget · TZS billion
3,500

Proposed new city with housing and associated facilities.

Land: Unresolved: 108,000 m² / 108 ha in source
Proposed structure: PPP / EPC + finance

Status described in March 2024: Reported as undeveloped. The land-area figures are not equivalent. Source p. 28.

Unguja · Central District

Binguni

Indicative homes
3,000
2024 budget · TZS billion
350

Proposed new city with housing and associated facilities.

Land: 100,000 m²
Proposed structure: PPP / EPC + finance

Status described in March 2024: Reported as undeveloped. Source p. 29.

SOURCE PHOTOGRAPHS & DESIGN MATERIAL

The sites and the proposal.

Original images extracted from the March 2024 report. Historical site photographs are not current progress photographs. Proposed drawings and sample designs are not evidence of completed construction.

PARTNERSHIP FRAMEWORK

Structures proposed
in the study.

Several components envisage a public-private partnership with ZHC contributing land as equity and a partner financing and developing the project. Other profiles propose EPC plus finance, joint ventures, FDI, grants or government contributions.

These are proposed financing routes, not evidence of committed funding, an awarded contract or an approved concession. No World Bank funding is established by this document.

Before entering discussions

  • Confirm which components remain available and the authorised procurement route.
  • Obtain current title, survey, occupancy, compensation and resettlement information.
  • Verify environmental approvals, utility capacity and detailed design requirements.
  • Request an updated feasibility model, cost plan and funding structure.
  • Confirm responsibility for construction, sales, operations and long-term maintenance.

Discover Zanzibar can help coordinate an enquiry. Publication does not establish an exclusive mandate or official endorsement.

FINANCIAL CONTEXT & SOURCE QUALITY

Indicative, not investment-ready.

The 2024 report gives a programme estimate of TZS 4.65 trillion and a historical USD equivalent of approximately $1.722 billion. This is not a current exchange-rate conversion. Its model states a 17% IRR, 30% return on equity, positive NPV of TZS 5.15 billion at an 11.44% discount rate, and a five-year payback conditional on 100% occupancy. These projections have not been independently validated.

Items requiring reconciliation

  • The component unit counts sum to 45,006, while the headline target is 45,000; the environmental chapter separately mentions 82,000 units.
  • The source alternates between six and nine locations, while presenting eleven component profiles.
  • The programme land total is stated as approximately 175 hectares. The Dunga profile gives 108,000 m² and 108 hectares, which are not equivalent.
  • The model assumes 36 months, but the implementation chapter says five years. Mfikiwa separately has a two-year construction estimate.
  • The financial conclusion labels 11.44% as IRR, whereas the main financial section gives 17%. Nyamanzi floor counts and stated unit totals also need checking.

These discrepancies are retained openly rather than silently corrected. The underlying feasibility, phasing and affordability assumptions require an updated professional review.

Source and newer context

Primary source: Zanzibar Housing Corporation, Pre-Feasibility Report for the Proposed Construction of 45,000 Housing Units in Zanzibar, March 2024, 51 pages. Page references above follow the report’s printed numbering. Prepared for this page on 18 November 2026.

A later ZIPA 2026 PPP opportunities publication separately lists Mfikiwa with an estimated cost of USD 22 million. That differs from the 2024 study, so the two estimates have not been combined. Current scope and procurement require confirmation with the responsible authority.

ZIPA 2026 PPP opportunities ↗Zanzibar Housing Corporation ↗

Images are reproduced from the user-supplied report and credited to the source. No AI-generated imagery is used. The full source report is available on request through Discover Zanzibar.

START WITH THE RIGHT INFORMATION

Discuss a component.

Tell us your preferred location and whether you are an investor, developer, EPC contractor or technical partner. We can help request current information and coordinate the next discussion.