Explore the official investment pipeline.
34 PPP briefs and 43 project and economic-zone profiles from two official 2026 publications. Some projects appear in both publications; these are source briefs, not 77 distinct projects. Catalogue stages are not confirmation of current tender availability. This independent directory is presented by Discover Zanzibar; it is not a ZIPA-operated service.
Blue economy · 2026 PPP publication
Marine Fish Cage Farming Project
Concept note prepared
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 9 (printed page 8) ↗Blue economy · 2026 PPP publication
Commercial Boat Building And Maintenance Factory In Zanzibar
Concept developed, Preliminary technical assessments to be conducted, Feasibility study to be undertaken, Environmental and Social Impact Assessment (ESIA) required, Land identification and permitting to be completed
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 12 (printed page 11) ↗Blue economy · 2026 PPP publication
Sustainable Deep-sea Fishing Industry In Zanzibar
Concept developed, Preliminary technical assessments to be conducted, Feasibility study to be undertaken, Environmental and Social Impact Assessment (ESIA) required, Land identification and permitting to be completed
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 15 (printed page 14) ↗Blue economy · 2026 PPP publication
Compressed Natural Gas (CNG) For Commercial And Households’ Customers In Zanzibar
Pre-Feasibility Study
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 18 (printed page 17) ↗Blue economy · 2026 PPP publication
Octopus And Fishprocessing Plant – Shumba Mjini
Site plan and Concept Note are available
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 21 (printed page 20) ↗Blue economy · 2026 PPP publication
Fish Processing And Landing Site – Fungu Refu
Feasibility Study ; Vessel purchase documents ; Factory facility blueprints ; Environmental approvals
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 24 (printed page 23) ↗Blue economy · 2026 PPP publication
Dry Anchovy Processing And Value Addition – Kama
Feasibility Study ; Vessel purchase documents ; Factory facility blueprints ; Environmental approvals
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 27 (printed page 26) ↗Trade & industry · 2026 PPP publication
Zanzibar Convention and Exhibition Center
Feasibility study pending ; Environmental and Social Impact Assessment (ESIA) Pending
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 31 (printed page 30) ↗Trade & industry · 2026 PPP publication
Quality Testing Laboratory and Certification Centre
Concept Note Available
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 33 (printed page 32) ↗Trade & industry · 2026 PPP publication
Utilities Meters Laboratories
Concept Note Available
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 35 (printed page 34) ↗Trade & industry · 2026 PPP publication
Dunga Industrial Park
Master plan
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 37 (printed page 36) ↗Infrastructure & transport · 2026 PPP publication
Zanzibar National Airline
Concept Stage
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 40 (printed page 39) ↗Infrastructure & transport · 2026 PPP publication
Zanzibar Mwambao Railway
Concept Stage
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 43 (printed page 42) ↗Infrastructure & transport · 2026 PPP publication
Helipads and Airstrips
Concept Stage
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 45 (printed page 44) ↗Infrastructure & transport · 2026 PPP publication
Terminal 4 - Abeid Amani Karume International Airport
AAKIA Master Plan
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 47 (printed page 46) ↗ICT & innovation · 2026 PPP publication
International Gateway For Zanzibar
Feasibility Study completed (2022)
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 50 (printed page 49) ↗ICT & innovation · 2026 PPP publication
Public Wi-fi Infrastructure
Concept stage
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 52 (printed page 51) ↗ICT & innovation · 2026 PPP publication
Technological Park at Fumba
Concept stage
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 55 (printed page 54) ↗Tourism · 2026 PPP publication
The Zanzibar Theme Park
Feasibility Study on going , Financial Model, Environmental and Social Impact Assessment, Resettlement Action Plan, all relevant permits and licenses available
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 59 (printed page 58) ↗Tourism · 2026 PPP publication
Eco-convention Centre
Concept stage
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 61 (printed page 60) ↗Tourism · 2026 PPP publication
Tourism Shopping Complex at Nungwi
Feasibility Study, Financial Model, ESIA, RAP completed
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 63 (printed page 62) ↗Housing · 2026 PPP publication
Residential Houses at Mfikiwa
Project concept note is available
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 66 (printed page 65) ↗Housing · 2026 PPP publication
Residential and Commercial Building at Saateni
Project concept note is available
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 69 (printed page 68) ↗Housing · 2026 PPP publication
Residential Houses at Kisakasaka “ A ” and “B”
Readiness not clearly stated in the official brief
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 72 (printed page 71) ↗Housing · 2026 PPP publication
Residential Buildings at Michenzani Zanzibar
Concept Note Available
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 75 (printed page 74) ↗Education · 2026 PPP publication
Central Library and Commercial Complex
Land acquisition, Concept developed, Feasibility study to be undertaken, Preliminary design
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 79 (printed page 78) ↗Health · 2026 PPP publication
Cardiac Centre In Zanzibar (Pemba), Tanzania
Concept Note
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 83 (printed page 82) ↗Health · 2026 PPP publication
Pediatric Hospital in Zanzibar
Concept Note
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 86 (printed page 85) ↗Youth & employment · 2026 PPP publication
Zanzibar Community Empowerment And Youth Job Center
Concept Stage
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 90 (printed page 89) ↗Ports & transport · 2026 PPP publication
Kizimkazi Multi-modal Port (Unguja South)
Feasibility studies, preliminary engineering designs, environmental and social impact assessments planned and going on
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 94 (printed page 93) ↗Ports & transport · 2026 PPP publication
Wete Port Development Project (Pemba)
Feasibility study completed, ESIA, and engineering assessments to be undertaken
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 96 (printed page 95) ↗Ports & transport · 2026 PPP publication
Sea-Taxi Network (Zanzibar Archipelago)
Concept design on process and guideline is going on
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 99 (printed page 98) ↗Energy · 2026 PPP publication
Reinforcement and Rehabilitation of Power Transmission and Distribution Network in Zanzibar
Feasibility study completed, ESIA, and engineering assessments to be undertaken
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 102 (printed page 101) ↗Energy · 2026 PPP publication
Resilient Solar Energy and Batterystorage System
Concept conducted
Readiness as described in the official publication; this is not an open tender notice. Related projects may also appear in the Investment Profile below. Confirm current availability with ZIPA.
Official PPP brief · PDF page 105 (printed page 104) ↗Health
Regional hospitals
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 7 ↗Health
Medical equipment manufacturing
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 8 ↗Health
Pharmaceutical manufacturing
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 9 ↗Health
Specialist and tertiary hospital
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 10 ↗Health
Albinism health centre
Master plan ready
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 11 ↗Blue economy
Fish landing facilities
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 13 ↗Blue economy
Deep-sea fishing
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 14 ↗Blue economy
Malindi cold storage and processing
Feasibility study available
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 15 ↗Blue economy
Anchovy processing
Feasibility study available
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 16 ↗Blue economy
Fungurefu fish processing
Feasibility study available
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 17 ↗Blue economy
Shumba Mjini seafood processing
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 18 ↗Blue economy
Fish cage aquaculture
Feasibility study available
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 19 ↗Blue economy
Pemba shrimp farming
Feasibility study available
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 20 ↗Aviation
Kigunda airport
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 22 ↗Aviation
AAKIA Terminal 4
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 23 ↗Aviation
Helipad development
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 24 ↗Aviation
Zanzibar national airline
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 25 ↗Aviation
Seaplane network
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 26 ↗Infrastructure
Michamvi–Marumbi toll bridge
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 28 ↗Infrastructure
Fumba–Unguja Ukuu toll bridge
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 29 ↗Infrastructure
Kizimkazi port
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 30 ↗Energy
LPG distribution
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 32 ↗Infrastructure
Lighthouse commercial areas
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 33 ↗Energy
Mangapwani LPG depot
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 34 ↗Energy
Mangapwani petroleum storage
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 35 ↗Energy
Oil and gas data repository
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 36 ↗Energy
Electricity network improvements
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 37 ↗Energy
Offshore wind
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 38 ↗Tourism
Beach sports venue
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 40 ↗Tourism
Aquarium development
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 41 ↗Tourism
Jewel City
Feasibility study available
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 42 ↗Tourism
Marina development
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 43 ↗Tourism
Eco-convention centre
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 44 ↗Tourism
Jozani theme park
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 45 ↗Agriculture
Irrigation rehabilitation
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 47 ↗Industry
Shared agro-processing facilities
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 48 ↗Industry
Packaging and labelling centres
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 49 ↗Agriculture
Women and youth horticulture
Concept stage
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 50 ↗Agriculture
Agricultural research capacity
Feasibility study available
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 51 ↗Economic zones
Fumba economic zone
Zone profile
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 53 ↗Economic zones
Micheweni economic zone
Zone profile
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 54 ↗Economic zones
Micheweni industrial park
See official project brief
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 55 ↗Economic zones
Dunga industrial park
Master plan ready
Listed in ZIPA’s 2026 investment catalogue. Read the official brief for the location, scope, responsible authority and any indicative investment requirements.
Official project brief · page 56 ↗